Aquifer Beaker

Edwards Aquifer

Aquifer Level 671.5'
5/25/17 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Year-Round Watering Hours

Watering with an irrigation system or sprinkler is allowed any day of the week before 11 a.m. or after 7 p.m.

Learn More »


Close

Aquifer Level 671.5 | Year-Round Watering Hours

eBill Site Maintenance

4 - 6:00 a.m.

The SAWS eBill site will be unavailable from 4 - 6:00 a.m. due to site maintenance. We apologize for the inconvenience. Please check back soon!


Close
Commercial Programs & Rebates

Annual Irrigation Checkup

Required Annual Irrigation Checkups Can Contribute to Water Savings

In an effort to maximize year-round water conservation efforts, the San Antonio City Council passed a water conservation ordinance addressing a variety of water conservation opportunities.

One of the provisions included in the ordinance requires that properties 5 acres or larger and properties defined as Large Use with in-ground irrigation systems submit an annual irrigation checkup to the San Antonio Water System Conservation Department by May 1 each year.

    2016 Updates to the Annual Irrigation Checkup Requirement

  • 1) Failure to Comply Charges
    • Beginning in 2016, failure to comply with the annual irrigation checkup requirement by May 1 will result in the assessment of the following additional charges on the account associated with the irrigation system:

    • (a) Annual enforcement fee in the amount of $153. This fee shall be assessed on an annual basis until the requirements of the checkup have been met.

    • (b) Additional volumetric rate of $0.0969 per 100 gallons on all irrigation consumption on a monthly basis beginning after the May 1 deadline. This additional rate shall continue to be assessed until the requirements of the checkup have been met.

    These charges will be assessed on all accounts associated with the irrigation system. Any accounts associated with irrigation not documented on the submittal of the Online Irrigation Checkup Form will be assessed the additional charges.

    2) Top Users Must Submit Irrigation System Analysis Forms
  • Properties with irrigation consumption over 2.5 million gallons in the previous calendar year must submit copies of the Irrigation System Analysis Form before May 1 in addition to submittal of the Online Irrigation Checkup Form to complete the compliance process.

  • The Irrigation System Analysis form requires documentation of the irrigation schedule, identification and action taken for maintenance issues, and calculation of the peak season estimated monthly total consumption based on representative zone GPMs and total run times provided by the irrigator.

  • SAWS will mail courtesy letters that will notify properties they are a Top User and are required to submit the Irrigation System Analysis Forms by May 1 to meet compliance. Properties can also contact SAWS Conservation to confirm if a specific property meets the Top User requirement.

    3) Approved Compliance Actions for Critical Maintenance Issues
  • All critical maintenance issues identified during the checkup inspection must be addressed by one of the following approved compliance actions for the property to meet compliance (Turning off an individual zone(s) or entire system is not an approved compliance action).

    • (a) Repairs Made

    • (b) Individual Zone(s) Permanently Disabled

    • (c) Entire System Permanently Disabled

    Note: SAWS Conservation offers a rebate for the permanent disabling of individual
    zone(s) or the entire irrigation system. The irrigation system must be inspected prior to removal to qualify for the rebate.

    4) Annual Checkup Exemption
  • Properties must be verified to have a permanently disabled irrigation system to be cleared from the irrigation checkup requirement. A site inspection will be required to complete the compliance process. The deadline for compliance and avoiding the rate and fee will not be extended if the site inspection is not completed by May 1. You must allow at least three weeks to schedule your inspection with SAWS Conservation in order to avoid the failure to comply rate and fee.

Properties must submit the Online Irrigation Checkup Form to meet compliance with the annual irrigation checkup requirement.

Let's Get Started

You will be required to create a user profile to begin the submission process for your property/properties. After successful submission of the online form, you will be sent a confirmation email that includes the Irrigation Checkup Compliance Report, a PDF copy of the Online Irrigation Checkup Form that can be provided to the responsible party as a record of successful submission.

Get Started

For all inquiries regarding the SAWS Annual Irrigation Checkup program, and the submittal process for the Online Irrigation Checkup Form, please contact SAWS Conservation at 210-233-3443 or send an email to: irrigationcheckup@saws.org