SAWS Procurement Bids: Bid Opening Results
Aquifer Beaker

Edwards Aquifer

Aquifer Level 681.5'
6/13/19 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Year-Round Watering Hours

Watering with an irrigation system or sprinkler is allowed any day of the week before 11 a.m. or after 7 p.m.

Learn More »


Close

Aquifer Level 681.5 | Year-Round Watering Hours

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
Procurement Bids

Bid Tabs

The bid tabulations appearing on this page are for awards that have been approved, including those approved by the Board of Trustees. If a tab you are looking for cannot be found on this page, it means that the award has not yet been finalized. Please check back frequently to view updated bid results.

 

Results 81 - 100 of 1092 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 »

Bid No. Type Close Dated Project Name Details
18-0378 IFB 8/20/18 Annual Contract for Rainwear View Results PDF
18-18101 IFB 8/14/18 Annual Contract for Quick Set Flowable Fill and Concrete Delivery View Results PDF
18-18098 IFB 8/10/18 Early Procurement of Lime Saturator Solids Contact Units for the Central Water Integration Pipeline Project View Results PDF
18-6023A IFB 8/7/18 Annual Contract for Dell Desktops, Laptops, Monitors and Accessories View Results PDF
18-4016A IFB 8/6/18 Annual Contract for Charter Bus Services View Results PDF
18-1317 IFB 7/31/18 Annual Contract for Paris Electronic Document Server Maintenance Renewal View Results PDF
18-18097 IFB 7/27/18 Early Procurement of Lime Storage Silo and Feed Equipment for Central Water Integration Pipeline Project View Results PDF
18-18099 IFB 7/27/18 Early Procurement of Medium Voltage Switchgear for the Central Water Integration Pipeline Project View Results PDF
18-18025 IFB 7/26/18 Purchase and Installation of a Fire Alarm Panel & Devices at the Medio Creek WWTP and Van Dyke Service Center View Results PDF
18-0365 IFB 7/24/18 Annual Contract for Ice Delivery View Results PDF
18-18023 IFB 7/17/18 Annual Contract for Digester Gas Sampling and Analysis View Results PDF
18-18087 IFB 7/13/18 Early Procurement of Carbon Dioxide Storage and Pressurized Feed System for the Central Water Integration Pipeline Project View Results PDF
18-18090 IFB 7/13/18 Early Procurement of On-Site Sodium Hypochlorite Generation System for the Central Water Integration Pipeline Project View Results PDF
18-18091 IFB 7/13/18 Early Procurement of Horizontal Split-Case Centrifugal Pumps for the Central Water Integration Pipeline Project View Results PDF
18-18079 IFB 7/10/18 Plugging of System Limberg Public Supply Wells View Results PDF
18-18068 IFB 7/10/18 Cleaning and Inspection of Sanitary Sewer Assets at the Former Salado Creek WRC Consent Decree Related View Results PDF
18-18076 IFB 6/27/18 Pre-Purchase of Pressure Filtration System for the Central Water Integration Pipeline Project View Results PDF
18-0028 IFB 6/26/18 Annual Contract for Miscellaneous Waterworks Brass Goods View Results PDF
18-0034 IFB 6/20/18 Annual Contract for Water Meter Strainers View Results PDF
18-1417 IFB 6/20/18 Annual Contract for HDPE DR-9 Pipe (Copper Tubing Size) View Results PDF

Results 81 - 100 of 1092 « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 »

Need the free Adobe® Reader® for PDF files? Click here.