SAWS Electrical Specifications for Primary Pumping Stations
Aquifer Beaker

Edwards Aquifer

Aquifer Level 671.8'
9/20/18 - Official

The Edwards aquifer and its catchment area in the San Antonio region is about 8,000 square miles and includes all or part of 13 counties in south-central Texas.

Learn More »


image

Stage 2:
Water On Your Day

Watering with an irrigation system or sprinkler is allowed only once a week from 7-11 a.m. and 7-11 p.m. on your designated watering day as determined by your address.

Learn More »


Close

Aquifer Level 671.8 | Stage 2: Water On Your Day

Log In

Pay Your Bill Online

Already registered? Log in now.

Forgot your password?

New User

My Account Page

No user account? No problem.

Sign Up Now


Close
image

SAWS Electrical Specifications for Primary Pumping Stations

San Antonio Water System (SAWS) requires the assistance of consultant electrical engineering companies to provide a complete design of the electrical system in newly constructed primary pumping stations and additions.

It is the responsibility of the consultant to know and understand the theory of pump station operation, preferred equipment and associated applications, and the latest technology of electrical equipment. The consultant shall be responsible for any electrical applications associated with: incoming 5kV services, 5kV switchgear, 5kV motor controllers, transformers, low voltage panels and wiring, capacitor application, SCADA, cathodic protection, and protective devices. Previous pump station applications should be considered when designing the electrical for a new station.

SAWS has adopted a standard production operating philosophies and the electrical controls of the pumping equipment incorporate these philosophies. SAWS has also developed preferences of equipment supplied, such as the Rosemount pressure switch or the Panametrics Flow Meter. Included in this Design Standard Handbook is the theory of operation, preferred equipment, typical drawings, and overall needs required by SAWS to design a complete primary pumping station.

Electrical Specs Documents

Need the free Adobe® Reader® for PDF files? Click here.