SAWS Pipelines Projects
The Pipelines – Capacity and Pipelines – Condition teams are responsible for overseeing engineering design of water and sewer pipeline installation, replacement, and rehabilitation projects for construction work contracted directly between SAWS and a contractor.
Design Information
- SAWS QA/QC Checklist – Water
- SAWS QA/QC Checklist – Sewer
- Design Guidelines for SAWS Water and Wastewater Projects – Updated 10/22
- SAWS Standard General Notes – Updated 11/24
- SAWS Plan Sheets Guide (zip)
- SAWS Standard Legend and Title Blocks (zip)
- Water Work Typical Plan Notes
- SAWS WTAP Codes for Service Route Data
- SAWS Standards For As-Built Drawings
- SAWS Construction Specifications
- SAWS Material Specifications
- SAWS Utility Service Regulations
Additional Design Information
- Bexar County Appraisal District
- Bexar County Records
- COSA Design Guidance Manual
- COSA Utility Excavation Criteria Manual (UECM) (pdf)
- COSA UECM Chapter 29 Amendments – Effective Feb. 1, 2017
- COSA Construction Specifications (pdf)
- City of San Antonio Public Works Department
- Texas Commission on Environmental Quality (TCEQ)
- Texas Administrative Code – Environmental Quality
Construction Information
- For Condition Team Projects: Monthly Observation Report Template
Adobe PDF | Microsoft Word - For Capacity Team Projects: Site Visit Observation Report Sample
- For Capacity Team Projects that call for it: Survey Verification Report Sample
- SAWS Change of Service Form
Adobe PDF | Microsoft Excel
Invoicing for Design
- For Condition Team Projects: Invoice Template
Design Invoice Template | Supplemental Invoice Template | Design + Supplemental Invoice Template - For CapacityTeam Projects: Invoice Template
Invoice Package Template - Schedule of Values Sample
Adobe PDF | Microsoft Excel - Project Schedule Template – IFB
Microsoft Project - Project Schedule Template – RFCSP
Microsoft Project
Document Management